Pile driving method - List of Manufacturers, Suppliers, Companies and Products | IPROS

Pile driving method Product List

1~2 item / All 2 items

Displayed results

Low-altitude hard ground pile driving method LH method

Low-altitude, under beams, pile driving method under railway and road bridges, and under power lines!

We would like to introduce the "Low-Head Type Rigid Ground Pile Driving Method LH Method" proposed by Go Plus Co., Ltd. This method is particularly suitable for construction on rigid ground under height restrictions (H = 4.0 to 8.0). It demonstrates its effectiveness in many challenging sites, such as "installing steel sheet piles in the rock and boulder layer under a bridge pier foundation at a height of 5.0m" and "installing H-shaped steel into the bedrock under overhead lines at a height of 5.0m." 【Method Classification】 ■ LH-RR Method ■ LH-DH Method ■ LH-CDH Method ■ CHV Method (can be used in combination with LH methods) *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Pile driving method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hang Work Method: "SKT (Skat) Method"

No restrictions on the installation site. A piling method with high mobility and precision.

The SKT (Skutt) method is a high-precision pile driving technique that directly attaches an earth auger to the boom of a rough-terrain crane. The biggest feature is that it can be used in any location. It has the turning capabilities of a crane, allowing it to operate in narrow urban areas, uneven terrain, slopes, and embankments, making it suitable for all kinds of sites. Additionally, assembly, movement, and disassembly are easy, resulting in significant time savings. 【Features】 ○ Equipped with an earth auger on a rough-terrain crane → Enables lightweight design and quick movement ○ Can access narrow sites in urban areas ○ Strong in constrained locations → A special earth auger method that does not require specific locations ○ Capable of driving piles on uneven surfaces or at distant locations ○ Adoption of a forced excavation mechanism → Increases excavation power against hard bedrock, boulders, and underground obstacles For more details, please contact us or download the catalog.

  • Ground foundation construction method
  • Special Construction Method
  • Pile driving method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration